• 0

Project Consultancy, Reports & Profiles

Agro and Food Processing: Project Opportunities in Uttarakhand

PROFILE:

Food processing involves any type of value addition to agricultural or horticultural produce and also includes processes such as grading, sorting and packaging which enhance shelf life of food products. The food processing industry provides vital linkages and synergies between industry and agriculture. The Food Processing Industry sector in India is one of the largest in terms of production, consumption, export and growth prospects. The government has accorded it a high priority, with a number of fiscal reliefs and incentives, to encourage commercialization and value addition to agricultural produce, for minimizing pre/post harvest wastage, generating employment and export growth. India's food processing sector covers a wide range of products fruit and vegetables; meat and poultry; milk and milk products, alcoholic beverages, fisheries, plantation, grain processing and other consumer product groups like confectionery, chocolates and cocoa products, Soya-based products, mineral water, high protein foods etc.

RESOURCES:

Uttarakhand comprises of total are 5672568 Hectares, of which forest area is 3485847 hectares. Fruits such as apples, oranges, pear, grapes peach, plum apricot, litchi, mangoes and guava are widely grown in the state and therefore have immense potential for development of horticultural crops and processing units. The State Government will assist in establishing small & medium size Agro Parks, Food Parks etc., which will provide common infrastructure facilities for storage, processing, grading and marketing, thus ensuring that surplus fruits and vegetables do not go waste as at present. Four Agri Export Zones have already been declared under the AEZ scheme of the Government of India for Litchi, Horticulture, Herbs, Medicinal Plants and Basmati Rice. Further, efforts will continue to promote production for export and provide access to domestic and export markets for products from the State.

GOVERNMENT POLICIES:

The Ministry of Food Processing Industries (MOFPI) is a ministry of the Government of India is responsible for formulation and administration of the rules and regulations and laws relating to food processing in India. The ministry was set up in the year 1988, with a view to develop a strong and vibrant food processing industry, to create increased employment in rural sector and enable farmers to reap the benefits of modern technology and to create a of surplus for exports and stimulating demand for processed food.

•        Custom duty rates have been substantially reduced on food processing plant and equipments, as well as on raw materials and intermediates, especially for export production.

•        Wide-ranging fiscal policy changes have been introduced progressively in food processing sector. Excise and Import duty rates have been reduced substantially. Many processed food items are totally exempt from excise duty.

•        Corporate taxes have been reduced and there is a shift towards market related interest rates. There are tax incentives for new manufacturing units for certain years, except for industries like beer, wine, aerated water using flavouring concentrates, confectionery, chocolates etc.

•        Indian currency, rupee, is now fully convertible on current account and convertibility on capital account with unified exchange rate mechanism is foreseen in coming years.

•        Repatriation of profits is freely permitted in many industries except for some, where there is an additional requirement of balancing the dividend payments through export earnings.

 

Biotechnology: Project Opportunities in Uttarakhand

PROFILE

The Biotechnology sector in India is one of the fastest growing sectors of the Indian Economy. As the sector is mainly based on knowledge, it is expected that it will play an important part in shaping the Indian Economy, which is developing at a rapid pace. The Indian Biotechnology sector holds immense potential in terms of research and development, skill and cost effectiveness. As per the eight annual survey by the Association of Biotechnology-led enterprise (ABLE) and a monthly journal, Bio-Spectrum, the sector grew threefold in five years and reported a revenue of US$ 3 billion during 2009-2011 with a 17 per cent rise as compared to the previous year.

RESOURCES

Uttarakhand is an ideal destination to invest in biotechnology-based industries because of several inherent advantages and being host to vast diversity of flora and fauna and rare species of plants and animals. A high-level biotechnology board is being setup to pursue initiatives in the field of research. The state will accord the units coming under this sector with the industry status and aims to establish an internationally competitive business infrastructure and environment for the industry in the state. Further, a biotechnology park is to be developed that will integrate resources and provide a focused institutional set up for accelerated commercial growth of bio-technology and bio-informatics. The Government is also in the process of creating an Exchange for Medicinal and Aromatic Plants to serve as a common platform for research institutions, technology developers and producers.

GOVERNMENT POLICIES:

The Uttarakhand Board of Biotechnology (UBB) will help the R&D Institutions of the State to seek funds from the national and international funding agencies / donors to upgrade the infrastructure facilities. Depending upon the need, UBB and the State Government will also try to fund R&D facilities through its own resources. The State Government undertakes to provide the following facilities/terms to the companies desirous of establishing BT units in the State:

•        BT Units including related R&D Units will enjoy the status of industry and will be eligible for incentives and concessions as provided for the relevant category/class of industry in the Industrial Policy of the State. For this purpose they shall be treated as Priority Sector Industry. Department of Biotechnology will provide The State Government undertakes to provide the following facilities/terms to the companies “single-window clearance” and shall issue only one application form to set up BT Units in the State.

•        The Government proposes to establish in association with private sector a BT Park initially at Halide, Pantnagar where land/plots would be made available to prospective entrepreneurs on favourable terms. The latter, however, are also free to choose their own sites or locate the same in the other established Industrial Areas in the State.

Hydropower: Project Opportunities in Uttarakhand

PROFILES:

Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. India was the 7th largest producer of hydroelectric power in 2008 after Norway: 114 TWh and 3.5 % the world total in 2008. The potential for hydroelectric power in India is one of the greatest in the world. Small hydropower offers a wide range of benefits-especially for rural areas and developing countries. The resource is environmentally responsible and has substantial economic advantages. Efforts also being made to improve the exchange of ideas and technology related to small hydropower. In India, small hydropower up to capacity of 25 MW also includes the mini-and-micro hydropower projects which are usually confined strictly to local use. A potential of over 15,000 MW has been identified from small hydropower and Government of India has been according top priority to SHP development as thrust area.

RESOURCES:

Uttarakhand has a large network of rivers and canals which provides an immense scope for hydro-power energy. In India, the development of Micro, Mini, and Small Hydro Power Projects started in the year 1897. One of the first hydro-power stations in India was commissioned at Galogi in 1907. More power stations were subsequently developed over a period of time. In Uttarakhand, the estimated capacity of Small hydro power projects is about 1500 MW out of total estimated capacity of 20,363 MW Uttaranchal has a hydropower potential of the order of 20236 MW against which only about 1407 MW has been harnessed so far.

GOVERNMENT POLICIES:

The Government of Uttaranchal (GoU) has decided to encourage generation of power through small hydropower sources of energy, and has framed a policy so that the development of this sector serves as an engine to achieve the objective of promoting the all-round development of the region. To encourage generation of hydropower the government of Uttarakhand has formulated and implemented policies with following objectives:

•        Creation of conducive conditions for encouraging private sector participation

•        Harnessing water resources in an environment friendly manner

•        Meeting the energy demand of the state/country

•        Promotion of the overall development of the region

•        Generation of revenue from hydro resources

 

Mineral: Project Opportunities in Uttarakhand

PROFILES:

A mineral is a naturally occurring solid chemical substance formed through biogeochemical processes, having characteristic chemical composition, highly ordered atomic structure, and specific physical properties. India is endowed with significant mineral resources. India produces 89 minerals out of which 4 are fuel minerals, 11 metallic, 52 non-metallic and 22 minor minerals.

RESOURCES:

Mineral resources of Uttarakhand play a significant role in the economy of Uttarakhand. The Chamoli district of Uttarakhand is especially famous for housing a number of mineral resources in Uttarakhand. The northern division of the district consist entirely of medium to high grade metamorphic rocks, which also contains bands of volcanic rocks in some areas; the southern division contains sedimentary and low-grade metamorphic rocks, with bands of volcanic rocks in some regions. Although much is not known about the geology of the first division of Chamoli, yet the mineral resources contain rocks such as quartzite, marble, and various types of schist and gneiss. The southern division contains rocks such as gneiss, limestone, phyllites, quartzite, sericite-biotite schist and slate.

Some of the important minerals that form a major part of the mineral resources of Uttarakhand are: Asbestos, Magnestic, Soapstone or Steatite, Copper, Iron, Graphite, Gold, Gypsum, Lead, Slate, Limestone, Building Stone, Sulfur, and Bitumen. Beside these major mineral resources, some of the other mineral resources of Uttarakhand also play a major role in enhancing the economy of Uttarakhand. Some of those mineral resources are: Antimony, Arsenic, Lignite or Brown Marble, Mica, Silver, etc.

GOVERNMENT POLICIES:

NATIONAL MINERAL POLICY, 2008

Keeping in view the long term national goals and perspective for exploitation of minerals, Government of India has revised its earlier National Mineral Policy, 1993 and came up with a new National Mineral Policy 2008. Basic goals of NMP 2008 are-

1.       Regional and detailed exploration using state of the art techniques in time bound manner.

2.       Zero waste mining

For achieving the above goals, important changes envisaged are:

•        Creation of improved regulatory environment to make it more conducive to investment and technology flows

•        Transparency in allocation of concessions

•        Preference for value addition

•        Development of proper inventory of resources and reserves

•        Enforcement of mining plans for adoption of proper mining methods and   optimum utilization of minerals 

•        Data filing requirements will be rigorously monitored

•        Old disused mining sites will be used for plantation or for other useful purposes.

•        Mining infrastructure will be upgraded through PPP initiatives

•        State PSU involved in mining sector will be modernized

•        State Directorate will be strengthened to enable it to regulate   mining in a proper way and to check illegal mining

•        There will be arms length distance between State agencies that mine  and those that regulate

•        Productivity and economics of mining operation, safety and health of workers and others will be encouraged.

Tourism: Project Opportunities in Uttarakhand

PROFILE:

Tourism in India is the largest service industry, with a contribution of 6.23% to the national GDP and 8.78% of the total employment in India. The tourism industry in India is substantial and vibrant, and the country is fast becoming a major global destination. India’s travel and tourism industry is one of them most profitable industries in the country, and also credited with contributing a substantial amount of foreign exchange. Indian Tourism offers a potpourri of different cultures, traditions, festivals, and places of interest.

RESOURCES:

Uttarakhand - the land of gods, the home of Himalayas and truly a paradise on earth, allures everyone from everywhere. Uttarakhand is paradise for different types of adventure activities. Like River Rafting, Trekking, Skiing, Camping, Rock Climbing, Rappelling, River Crossing. Mountaineering, Paragliding and Hot Ballooning make Uttarakhand one of the most attractive destinations for adventure sports not only in the India but the world. Gangotri and Yamunotri, the sources of both the Ganges and Yamuna fall in the upper reaches of the state and together with Badrinath (dedicated to Vishnu) and Kedarnath (dedicated to Shiva) form the Char Dham, one of Hinduism's most spiritual and auspicious pilgrimage circuits. Haridwar, meaning "Gateway to God" is a prime Hindu destination. Haridwar hosts the Kumbha Mela every twelve years, in which millions of pilgrims take part from all parts of the India and the world. Rishikesh near Haridwar is known as the preeminent yoga centre of India. The state has an abundance of temples and shrines, many dedicated to local deities or manifestations of Shiva and Durga, references to many of which can be found in Hindu scriptures and legends.

GOVERNMENT POLICIES:

In order to develop tourism in India in a systematic manner, position it as a major engine of economic growth and to harness its direct and multiplier effects for employment and poverty eradication in an environmentally sustainable manner, the National Tourism Policy was formulated in the year 2002. Broadly, the Policy attempts to:-

•        Position tourism as a major engine of economic growth;

•        Harness the direct and multiplier effects of tourism for employment generation, economic development and providing impetus to rural tourism;

•        Focus on domestic tourism as a major driver of tourism growth.

•        Position India as a global brand to take advantage of the burgeoning global travel trade and the vast untapped potential of India as a destination;

•        Acknowledges the critical role of private sector with government working as a pro-active facilitator and catalyst;

•        Create and develop integrated tourism circuits based on India’s unique civilization, heritage, and culture in partnership with States, private sector and other agencies; and ensure that the tourist to India gets physically invigorated, mentally rejuvenated, culturally enriched, spiritually elevated and feel India from within.

 

Waste management and recycling: Project Opportunities in Uttarakhand

PROFILE:

Rapid industrialization last few decades have led to the depletion of pollution of precious natural resources in India depletes and pollutes resources continuously. Further the rapid industrial developments have, also, led to the generation of huge quantities of hazardous wastes, which have further aggravated the environmental problems in the country by depleting and polluting natural resources. Therefore, rational and sustainable utilization of natural resources and its protection from toxic releases is vital for sustainable socio-economic development.

Hazardous waste management is a new concept for most of the Asian countries including India. The lack of technical and financial resources and the regulatory control for the management of hazardous wastes in the past had led to the unscientific disposal of hazardous wastes in India, which posed serious risks to human, animal and plant life.

RESOURCES:

Investments are aimed at improving public health and the environmental quality in the Program towns and the adjacent open land and water bodies by increasing solid waste collection coverage from 50% to 72% and supporting sound solid waste disposal methods. Improvements will be directed at (i) segregation of solid waste at household level and handling and management improvements at wards and town levels with an emphasis on waste minimization, (ii) provision of solid waste collection and transportation equipment, and (iii) construction of sanitary landfills in accordance with GoI’s Municipal Solid Waste Management and Handling Rules 2000. These will develop into a State wide SWM strategy, action plan, and town wise SWM master plan reports supported by capacity building of ULBs in SWM.

GOVERNMENT POLICIES:

National policy on waste management is set out in the October 1998 policy statement on waste management- Changing our ways. It outlines the Government's policy objectives in relation to waste management, and suggests some key issues and considerations that must be addressed to achieve these objectives. The policy is firmly grounded in an internationally recognised hierarchy of options, namely prevention, minimisation, reuse/recycling, and the environmentally sustainable disposal of waste which cannot be prevented or recovered.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Phenolic Foam
Phenolic Foam

Phenolic foam is a dense, lightweight and porous material that can be cut into virtually any shape. It holds its shape when... Read More

Capacity :
3,600,000 Pcs/annum
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
270.00Lakhs
Add To Inquiry Basket
Mango Pickles
Mango Pickles

Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both.... Read More

Capacity :
1,500,000 kgs/annum
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
253.00Lakhs
Add To Inquiry Basket
Black Braided Silk Sutures (Non Absorbable Surgical Suture)
Black Braided Silk Sutures (Non Absorbable Surgical Suture)

Black Braided Silk Sutures (Non Absorbable Surgical Suture)

There are so many fibre... Read More

Capacity :
Black Braided Silk Surgical Sutures:250 Boxes/Day
Plant and Machinery cost:
63.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.20%
Break Even Point (BEP):
54.09 %
TCI :
146.00 Lakhs
Cost of Project :
146.00Lakhs
Add To Inquiry Basket
LDPE LLDPE Pouch Films
LDPE LLDPE Pouch Films

LDPE/LLDPE Pouch Films

Plastic, today, is being increasingly utilized in almost eve... Read More

Capacity :
LDPE/LLDPE Pouch Films :1.2 MT/Day
Plant and Machinery cost:
30.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.32%
Break Even Point (BEP):
41.09 %
TCI :
254.00 Lakhs
Cost of Project :
254.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice stra... Read More

Capacity :
Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.18%
Break Even Point (BEP):
56.37 %
TCI :
314.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
Pomegranate Farming
Pomegranate Farming

Pomegranate (Punica granatum) is an ancient favorite table fruit of tropical and sub-tropical regions of the world. The fruit is symbolic of plenty... Read More

Capacity :
•Pomogranate Fruits :600 Kgs/Day •Wheat:10 Kgs/Day
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
8.34%
Break Even Point (BEP):
22.53 %
TCI :
533.00 Lakhs
Cost of Project :
533.00Lakhs
Add To Inquiry Basket
Bleaching Earth
Bleaching Earth

Bleaching earth consists primarily of hydrous aluminium silicates (clay minerals) of varying composition. Common components are montmorillonite, ka... Read More

Capacity :
20MT/Day
Plant and Machinery cost:
72.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.38%
Break Even Point (BEP):
44.37 %
TCI :
712.00 Lakhs
Cost of Project :
712.00Lakhs
Add To Inquiry Basket
Hollow Glassware
Hollow Glassware

Glass is an amorphous (non-crystalline) solid material which is often transparent and has widespread practical, technological, and decorative usage... Read More

Capacity :
Hollow Glass Ware:8 MT/Day
Plant and Machinery cost:
172.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.59%
Break Even Point (BEP):
62.29 %
TCI :
433.00 Lakhs
Cost of Project :
433.00Lakhs
Add To Inquiry Basket
PVC Shrink Sleeves
PVC Shrink Sleeves

Shrink sleeve labels are sleeves constructed from film material that, rather than using adhesive, shrinks to a product’s surface... Read More

Capacity :
PVC Shrink Sleeves:400 Pkts/Day
Plant and Machinery cost:
72.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
13.16%
Break Even Point (BEP):
66.91 %
TCI :
202.00 Lakhs
Cost of Project :
202.00Lakhs
Add To Inquiry Basket
Wood Plastic Composite (WPC)
Wood Plastic Composite (WPC)

Wood plastic composites (WPCs) are roughly 50:50 mixtures of thermoplastic polymers and small wood particles. The wood and thermoplastics are usual... Read More

Capacity :
4923 Sq. Ft/Day
Plant and Machinery cost:
173.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.67%
Break Even Point (BEP):
54.70 %
TCI :
557.00 Lakhs
Cost of Project :
557.00Lakhs
Add To Inquiry Basket
Integrated Unit Cold Storage with Food Processing
Integrated Unit Cold Storage with Food Processing

Cold storage is a system for holding produce in an atmosphere that differs substantially from normal air in respect to CO2 and O2 levels. The gas m... Read More

Capacity :
Mango Pulp (200 Kgs Size Drum Pack) : 10,000 Packs/Annum Mango Jelly (10 Kgs Size Poly Pack): 25,000
Plant and Machinery cost:
500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
54.00 %
TCI :
1749.00 Lakhs
Cost of Project :
1749.00Lakhs
Add To Inquiry Basket
Repair & Refurbishment of Power Transformers
Repair & Refurbishment of Power Transformers

Transformer is a machine that transfers electrical energy from one electrical circuit to another without changing frequency by the principle of ele... Read More

Capacity :
Repairs of 25 MVA Power Transformers : 60 Nos/Annum Repairs of 50 MVA Power Transformers: 36 Nos/Ann
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
65.00 %
TCI :
200.00 Lakhs
Cost of Project :
200.00Lakhs
Add To Inquiry Basket
Industrial Safety Leather Shoes
Industrial Safety Leather Shoes

An Industrial Safety Leather Shoes steel-toe boot is a durable boot or shoe that has a protective reinforcement in the toe which protects the foot ... Read More

Capacity :
300,000 Pairs/Annum
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
73.00 %
TCI :
359.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Fruit Pulp ,Mango, Guava, Pomegranate, Papaya
Fruit Pulp ,Mango, Guava, Pomegranate, Papaya

Fruit pulp is prepared from selected varieties of fruits. Fully matured fruits are harvested and quickly transported to the fruit processing plant.... Read More

Capacity :
Mango Pulp : 1200 MT/Annum Guava Pulp: 1200 MT/Annum Pomegranate Pulp: 1200 MT/Annum Papaya Pulp: 12
Plant and Machinery cost:
66.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
70.00 %
TCI :
379.00 Lakhs
Cost of Project :
379.00Lakhs
Add To Inquiry Basket
Virgin Coconut Oil
Virgin Coconut Oil

Virgin coconut oil (VCO) is the pure... Read More

Capacity :
Virgin Coconut Oil (Packed in 1 Ltr Glass Bottle): 90,000Ltrs/Annum
Plant and Machinery cost:
63.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
61.00 %
TCI :
195.00 Lakhs
Cost of Project :
195.00Lakhs
Add To Inquiry Basket
Atta, Maida, Suji& Wheat Bran (Roller Flour Mill)
Atta, Maida, Suji& Wheat Bran (Roller Flour Mill)

Around 800 large Flour Mills in the ... Read More

Capacity :
Maida: 16500 MT/annum Sooji : 9900 MT/annum Wheat Flour: 41400 MT/annum Bran: 14700 MT/annum
Plant and Machinery cost:
1648.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
2660.00 Lakhs
Cost of Project :
2660.00Lakhs
Add To Inquiry Basket
Fulvic Acid
Fulvic Acid

Fulvic acid is a part of the humic s... Read More

Capacity :
1200MT/Annum
Plant and Machinery cost:
42.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
42.00 %
TCI :
160.00 Lakhs
Cost of Project :
160.00Lakhs
Add To Inquiry Basket
NAMKEEN (DALMOTTH, BHUJIA, CHANA CHUR, KHATTA MEETHA)
NAMKEEN (DALMOTTH, BHUJIA, CHANA CHUR, KHATTA MEETHA)

Dal Moth, Chanachur,Bhujia and khatt... Read More

Capacity :
300 Tonn/Annum
Plant and Machinery cost:
8.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
62.00 %
TCI :
81.00 Lakhs
Cost of Project :
81.00Lakhs
Add To Inquiry Basket
PET RECYCLING
PET RECYCLING

Polyethylene terephthalate or PET (also known as PETE) is one of the most common types of plastic. Most single-serve plastic bottles, including tho... Read More

Capacity :
Recycled PET Granules : 12MT/day
Plant and Machinery cost:
189.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
513.00Lakhs
Add To Inquiry Basket
Vacuum Fried Vegetable Chips (Sweet Potato, Beans and Beetroot)
Vacuum Fried Vegetable Chips (Sweet Potato, Beans and Beetroot)

India is one of the largest producers of potato. Besides being used as a daily food item in various vegetable preparations, potato today increasing... Read More

Capacity :
Sweet potato: 120 kg/day Beat root: 80 kg/day Beans chips: 266 kg/day
Plant and Machinery cost:
83.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
209.00Lakhs
Add To Inquiry Basket
Aluminium Foil
Aluminium Foil

Aluminium plays a major role in the modern world through its innumerable forms of applications- from kitchen ware to electric conductors and from r... Read More

Capacity :
6 MT/Day
Plant and Machinery cost:
312.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
312.00Lakhs
Add To Inquiry Basket
Particle Board (Wood Base)
Particle Board (Wood Base)

Particle Boards are a relatively new type of engineered wood product.It is cheaper, denser and more uniform than conventional wood and plywood. The... Read More

Capacity :
600Nos/day
Plant and Machinery cost:
452.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
54.00 %
TCI :
1066.00 Lakhs
Cost of Project :
1066.00Lakhs
Add To Inquiry Basket
High Tensile Wire Used in Prestressed Concrete Poles and Railway Sleepers
High Tensile Wire Used in Prestressed Concrete Poles and Railway Sleepers

High tensile wires are those which can withstand great strain without breaking or becoming deformed. High tensile wire is made with higher carbon s... Read More

Capacity :
60 MT/day
Plant and Machinery cost:
224.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
958.00 Lakhs
Cost of Project :
958.00Lakhs
Add To Inquiry Basket
MIG Welding Wire
MIG Welding Wire

MIG ... Read More

Capacity :
MIG Welding Wire : 12000 MT/annum
Plant and Machinery cost:
921.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
2052.00 Lakhs
Cost of Project :
2052.00Lakhs
Add To Inquiry Basket
Aluminium Foil
Aluminium Foil

Aluminium plays a major role in the m... Read More

Capacity :
Household, Food Packaging: 3,000 MT/Annum Grade Aluminium Foil Pharmaceutical Grade Printed : 1,500
Plant and Machinery cost:
1340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
2717.00 Lakhs
Cost of Project :
2717.00Lakhs
Add To Inquiry Basket
Jeans Manufacturing Unit
Jeans Manufacturing Unit

Jeans are trousers, a type of garment... Read More

Capacity :
Readymede Garment (Jeans) : 120,000 Pcs/Annum
Plant and Machinery cost:
35.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
48.00 %
TCI :
415.00 Lakhs
Cost of Project :
415.00Lakhs
Add To Inquiry Basket
Medium Density Fiberboard (MDF)
Medium Density Fiberboard (MDF)

Fiberboard is a type of engineered wo... Read More

Capacity :
15,000CBM/annum
Plant and Machinery cost:
1213.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
55.00 %
TCI :
2050.00 Lakhs
Cost of Project :
2050.00Lakhs
Add To Inquiry Basket
Thermocol Plates, Cups, Bowls and Glasses
Thermocol Plates, Cups, Bowls and Glasses

 

Read More

Capacity :
Thermocol Cups: 30,000 Th.Pcs/Annum Thermocol Glasses : 30,000 Th.Pcs/Annum Thermocol Plates: 100000
Plant and Machinery cost:
461.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
51.00 %
TCI :
717.00 Lakhs
Cost of Project :
717.00Lakhs
Add To Inquiry Basket
Herbal Wine
Herbal Wine

Wine is an alcoholic beverage made f... Read More

Capacity :
Herbal Wine (750 ml Size Bottle): 800,000 Nos/annum
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
65.00 %
TCI :
334.00 Lakhs
Cost of Project :
334.00Lakhs
Add To Inquiry Basket
Paracetamol
Paracetamol

Paracetamol, also known as acetamino... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Roller Flour Mill
Roller Flour Mill

Around 800 large F... Read More

Capacity :
Maida: 22,500 MT/annum Sooji: 5,400 MT/annum Wheat Flour : 9000 MT/annum Bran
Plant and Machinery cost:
2085.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
2899.00 Lakhs
Cost of Project :
2899.00Lakhs
Add To Inquiry Basket
Canvas Shoes
Canvas Shoes

Footwear refers to garments worn on ... Read More

Capacity :
Canvas Shoes:1200,000 pairs/annum Leather Shoes:900,000 pairs/annum
Plant and Machinery cost:
607.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
64.00 %
TCI :
1006.00 Lakhs
Cost of Project :
1006.00Lakhs
Add To Inquiry Basket
METHYL METHACRYLATE
METHYL METHACRYLATE

Methyl methacrylate (MMA) is an organic compound with the formula CH2=C(CH3)COOCH3<... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Maltodextrin
Maltodextrin

Maltodextrin is a mixture of glucose, maltose, oligosaccharides and polysaccharides. Maltodextrin is 15 to 20%... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Petroleum Jelly
Petroleum Jelly

Petroleum jelly or petrolatum was discovered as a paraffin-like material coating oil rigs. Since then, it has ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Blood Bags
Blood Bags

Blood bag is a disposable bio-medical device used for collection, storage, transportation and transfusion of human blood and blood components. The ... Read More

Capacity :
10000 Nos./Day
Plant and Machinery cost:
176.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.24%
Break Even Point (BEP):
69.15 %
TCI :
1106.00 Lakhs
Cost of Project :
1106.00Lakhs
Add To Inquiry Basket
Distribution Transformer
Distribution Transformer

A distribution transformer is a transformer that provides the final voltage transformation in the electric power distribution system, stepping down... Read More

Capacity :
2000 Nos./Annum
Plant and Machinery cost:
44.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
391.00 Lakhs
Cost of Project :
391.00Lakhs
Add To Inquiry Basket
Production Unit of Liquid Washing Soap, Perfumed Bleach for the Wash of White Cloths, Toilet Tills Hard Stains Remover Liquid , Detergent Powder
Production Unit of Liquid Washing Soap, Perfumed Bleach for the Wash of White Cloths, Toilet Tills Hard Stains Remover Liquid , Detergent Powder

Production Unit of Liquid Washing Soap, Perfumed Bleach for the Wash of White Cloths, Toi... Read More

Capacity :
Detergent Powder:3.2 MT/day•Liquid Washing Soap:3.2 MT/day •Toilet Cleaner:3.2 MT/day •Perfumed Blea
Plant and Machinery cost:
72.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
74.00 %
TCI :
210.00 Lakhs
Cost of Project :
210.00Lakhs
Add To Inquiry Basket
Citric Acid
Citric Acid

Citric acid is described as “nature's acidulant”, occurring in a wide variety of plants, citrus fruits, animal tissues, micro-organisms... Read More

Capacity :
100 MT/Day
Plant and Machinery cost:
14950.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.04%
Break Even Point (BEP):
44.33 %
TCI :
18350.00 Lakhs
Cost of Project :
18350.00Lakhs
Add To Inquiry Basket
ENZYME (Alkaline Protease ,Amylase ,Cellulase, Laccase)
ENZYME (Alkaline Protease ,Amylase ,Cellulase, Laccase)

Enzymes are macromolecular biological catalysts. Enzymes accelerate, or catalyze, chemical reactions. The molecules at the beginning of the process... Read More

Capacity :
Alkaline Protease 1MT/Day •Amylase 1MT/Day •Cellulase 1MT/Day •Laccase 1MT/Day
Plant and Machinery cost:
5693.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.32 %
TCI :
14825.00 Lakhs
Cost of Project :
14825.00Lakhs
Add To Inquiry Basket
Plastic Optical Lenses
Plastic Optical Lenses

Optical Lenses are optical components designed to focus or diverge light. Optical Lenses, which may consist of a single or multiple elements, are u... Read More

Capacity :
60,000 Pairs/Day
Plant and Machinery cost:
1026.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
2211.00 Lakhs
Cost of Project :
2211.00Lakhs
Add To Inquiry Basket
SOLAR PANEL
SOLAR PANEL

Solar Panels are in general Silicon ... Read More

Capacity :
Solar PV Module (240 watt) : 350 Nos/day (25 MW)
Plant and Machinery cost:
278.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
852.00 Lakhs
Cost of Project :
852.00Lakhs
Add To Inquiry Basket
PVC Membrane for Waterproofing
PVC Membrane for Waterproofing

The sheet of polyvinyl chloride is used as waterproof barrier in construction for all types of roofs, terraces, walls also in civil engineering in ... Read More

Capacity :
PVC Membrane (2 mm Thickness):3,333 SQM/Day
Plant and Machinery cost:
238.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.76%
Break Even Point (BEP):
57.50 %
TCI :
469.00 Lakhs
Cost of Project :
469.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

A sanitary napkin or a sanitary towe... Read More

Capacity :
18000 Packets/Day
Plant and Machinery cost:
99.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.32%
Break Even Point (BEP):
45.69 %
TCI :
321.00 Lakhs
Cost of Project :
321.00Lakhs
Add To Inquiry Basket
IV Fluid and Dialysis Solution
IV Fluid and Dialysis Solution

Intravenous therapy IV therapy is th... Read More

Capacity :
IV Fluid NS5 (500 ml Size):8,000 Bottles/Day •IV Fluid DNS (500 ml Size): 8,000 Bottles/Day •IV Flui
Plant and Machinery cost:
315.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.41%
Break Even Point (BEP):
43.11 %
TCI :
1151.00 Lakhs
Cost of Project :
1151.00Lakhs
Add To Inquiry Basket
Export House
Export House

Export means taking goods out of India to a place outside India.” Export trade in India is regulated by the Directorate General of Foreign Tr... Read More

Capacity :
Fruits – Apple 800.0 Kgs/Day•Banana 600 Kgs/Day •Mango 600 Kgs/Day •Grapes 400 Kgs/Day •Pomogranates
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.98%
Break Even Point (BEP):
59.05 %
TCI :
697.00 Lakhs
Cost of Project :
697.00Lakhs
Add To Inquiry Basket
Freeze Dried Vegetables
Freeze Dried Vegetables

Most foods contain very high percentage of water. Microorganisms thrive when there is water, spoiling the food and altering its taste. Removing wat... Read More

Capacity :
Freeze Dried Vegetables 730 Kgs/Day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.19%
Break Even Point (BEP):
53.97 %
TCI :
572.00 Lakhs
Cost of Project :
572.00Lakhs
Add To Inquiry Basket
Complex NPK Fertilizer
Complex NPK Fertilizer

Fertilizers are chemical compounds applied to promote plant and fruit growth. Fertilizers are usually applied either through the soil (for uptake b... Read More

Capacity :
Complex NPK Fertilizer 17:17:17 Grade: 600 MT/Day
Plant and Machinery cost:
2745.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
65.63 %
TCI :
6946.00 Lakhs
Cost of Project :
6946.00Lakhs
Add To Inquiry Basket
Pharmaceutical Unit (Tablets, Syrup, Capsules & Ointment)
Pharmaceutical Unit (Tablets, Syrup, Capsules & Ointment)

The pharmaceutical industry develops, produces, and markets drugs or pharmaceuticals licensed for use as medications. Pharmaceutical companies are ... Read More

Capacity :
0
Plant and Machinery cost:
840.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.84%
Break Even Point (BEP):
29.39 %
TCI :
136219.00 Lakhs
Cost of Project :
136219.00Lakhs
Add To Inquiry Basket
Ayurvedic Churna & Tablets
Ayurvedic Churna & Tablets

Ayurvedic medicine is a traditional type of medicine. It is now being recognized all over the world as one of the best type of medicine. It was ing... Read More

Capacity :
Gastritis Sugar Coated Tablets :1000 Bottles/Day •Liver Tablets :1000 Bottles/Day •Panchsakara Churn
Plant and Machinery cost:
91.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.83%
Break Even Point (BEP):
44.75 %
TCI :
354.00 Lakhs
Cost of Project :
354.00Lakhs
Add To Inquiry Basket
Water Treatment Chemicals (Antiscalants and Membrane Cleaners)
Water Treatment Chemicals (Antiscalants and Membrane Cleaners)

There has been a dramatic increase in the number of reverse osmosis and nano-filtration plant over the past ten years. There has also been a prolif... Read More

Capacity :
Capacity Antiscalants: 5MT/Day, Membrane Cleaners: 5 MT/Day
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.82%
Break Even Point (BEP):
63.96 %
TCI :
613.00 Lakhs
Cost of Project :
613.00Lakhs
Add To Inquiry Basket
Aluminium Collapsible Tubes (Printed)
Aluminium Collapsible Tubes (Printed)

A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in ... Read More

Capacity :
Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day
Plant and Machinery cost:
608.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.40%
Break Even Point (BEP):
41.58 %
TCI :
1158.00 Lakhs
Cost of Project :
1158.00Lakhs
Add To Inquiry Basket
Thermocol Glass and Plates (Low Investment Project)
Thermocol Glass and Plates (Low Investment Project)

There are many kinds of plastics in the world, any plastics when react with the Blowing Agent will become "Foam" which generally called "Foam Plast... Read More

Capacity :
Glasses: 324000 Glasses/Day, Plates: 162000 Plates/Day
Plant and Machinery cost:
73.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
35.00 %
TCI :
245.00 Lakhs
Cost of Project :
245.00Lakhs
Add To Inquiry Basket
Chilli Oil
Chilli Oil

Spices are used for flavour, colour, aroma and preservation of food or beverages. Spices may be derived from many parts of the plant: bark, buds, f... Read More

Capacity :
Chilli Oil :20 Kgs/Day Chilli Oleoresin:60 Kgs/Day
Plant and Machinery cost:
57.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.91%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
147.00Lakhs
Add To Inquiry Basket
Egg Powder
Egg Powder

Egg is a highly nutritious product. ... Read More

Capacity :
4.2MT/Day
Plant and Machinery cost:
672.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
49.00 %
TCI :
1044.00 Lakhs
Cost of Project :
1044.00Lakhs
Add To Inquiry Basket
Medical College with Hospital
Medical College with Hospital

A medical college is meant to impart education of medical field to students to qualify them as doctors in different sp... Read More

Capacity :
Total Students per Annum:150 Students Admitted/Annum 750 Beded Hospital
Plant and Machinery cost:
2047.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
42.00 %
TCI :
10747.00 Lakhs
Cost of Project :
10747.00Lakhs
Add To Inquiry Basket
Pharmaceutical Unit (Tablet And Capsules)
Pharmaceutical Unit (Tablet And Capsules)

The Indian pharmaceutical sector has come a long way, being almost non-existent before 1970 to a prominent provider of healthcare products, meeting... Read More

Capacity :
Tablets:10,000 Strips/Day •Capsules:10,000 Strips/Day
Plant and Machinery cost:
262.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
554.00 Lakhs
Cost of Project :
554.00Lakhs
Add To Inquiry Basket
PVC Flex Banner (Frontlit, Backlit & Vinyl)
PVC Flex Banner (Frontlit, Backlit & Vinyl)

PVC flex is made out of PVC and fabric raw material, specially designed for solve... Read More

Capacity :
PVC Flex Banner (Frontlit/Backlit) 440 g/m2:20 MT/Day •PVC Flex Banner Vinyl 440 g/m2:5 MT/Day
Plant and Machinery cost:
550.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
1196.00 Lakhs
Cost of Project :
1196.00Lakhs
Add To Inquiry Basket
Reclamation of Used Engine Oil by Alkali Refining Process(Caustic Soda)
Reclamation of Used Engine Oil by Alkali Refining Process(Caustic Soda)

Huge amounts of used lubricating oils from automotive sources are disposed of as a harmful waste into the environment. The cost and availability of... Read More

Capacity :
Reclaimed Engine Oil :5000 Litres/Day
Plant and Machinery cost:
49.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
57.00 %
TCI :
161.00 Lakhs
Cost of Project :
161.00Lakhs
Add To Inquiry Basket
Polyethylene Wax
Polyethylene Wax

Waxes are among the oldest worked materials used by humans. Their value as versatile construction materials (man's first plastic) was discovered ve... Read More

Capacity :
20 MT/ Day
Plant and Machinery cost:
258.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
704.00 Lakhs
Cost of Project :
704.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Starting a Glass Bottles ... 300 MT Per Day 27.00 10600.00
Calcium Chloride Manufact... Calcium Chloride (Flakes): 1667 MT Per Day Carbon Di-oxide (By Product): 463 MT Per Day 26.00 101000.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kg 30.00 198.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kgs 29.00 200.00
Iodine Granules from Iodi... 200 MT Per Annum 31.00 600.00
Activated Carbon from Coc... 6 MT Per Day 29.00 720.00
Sanitary Napkins Manufact... Sanitary Napkins 8pcs in one pkt. (260 mm Size):  21,600 PKTS Per Day 31.00 305.00
Low Toxicity Base Oil fro... 100,000 Ltrs. Per Day 43.00 7200.00
Lab Grown Diamonds (CVD D... Lab Cultured Diamonds (1 Carat): 30 Carat Per Day 24.00 534.00
Manufacturing Business Pl... Zinc Ingots (Purity 98%) 6 MT Per Day 29.00 863.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
12345678910...

Showing 1261 - 1320 of 2752 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.